MONDAY · 16 NOV 2026Ponta Grossa 25°C ☀️
Advertisement
Politics

Costa Rica Solution: Fábio Silva highlights progress on the project

Costa Rica Solution advances in Ponta Grossa. Councilman Fábio Silva highlights the project that provides new accesses and improvements in the region's traffic

Solução Costa Rica: Fábio Silva destaca avanço da obra
reprodução/CMPG
Advertisement

The Solução Costa Rica, a project long awaited by residents of Ponta Grossa, has once again gained prominence in discussions on urban mobility. The councilor Fábio Silva (Republicans) has emphasized the importance of the interventions planned to improve access to the Costa Rica, Panama, London, Golden Lagoon and nearby communities.

The initiative involves articulations between the Prefeitura de Ponta Grossa, the prefeita Elizabeth Schmidt, the federal deputy Aliel Machado and representatives of the municipal administration, with the aim of addressing the congestions that are part of the routine of thousands of residents.

First stage provides new access alternative

The first intervention linked to the Solução Costa Rica contemplates the implementation of a connection between the London Residential and the San Martin Core, offering a new alternative of displacement towards the Uvaranas region.

According to official information from the City Hall, the notice of this link was published in August 2026, with an estimated investment of R$ 3.1 million. The project contemplates approximately 800 meters of road connection, including improvements in infrastructure, sidewalks and bike paths.

The proposal seeks to reduce dependence on current access, especially at busy times, when drivers face queues and difficulties entering and leaving neighborhoods.

Councillor highlights political articulation

Fábio Silva has associated the project’s advancement with the joint work with prefeita Elizabeth Schmidt, deputado Aliel Machado and Secretary Luiz Henrique Honesko.

The parliamentary participation was also highlighted during the disclosure of the first stage, when he highlighted the expected impacts for families living in the region.

In social networks, residents expressed support for the initiative, but also made charges on the execution of the works, the problems of paving, drainage and the need for effective solutions for transit.

Full project foresees millionaire investment

The initial intervention integrates a broader planning, previously estimated at approximately R$ 45 million, which contemplates structuring works to improve circulation in the region.

Among the improvements planned in the complete project are the construction of a new railway viaduct, the duplication of sections of Avenida Valério Ronchi, a new bridge over the Rio Verde and the deployment of roundabouts to reorganize the flow of vehicles.

Despite the announced advances, the execution of interventions depends on the stages of hiring, the availability of resources and the procedures necessary for the start of services.

For residents, the main expectation remains the same: to turn ads into concrete improvements and reduce congestion that hampers daily movement between neighborhoods and other regions of Ponta Grossa.

Technical bus fare rises 8.4% in Ponta Grossa

Want to see BnT more often on Google?
Luis Carlos Pimentel
Author
Luis Carlos Pimentel
Formado em Técnica Contábil, estudou Jornalismo na Faculdade Secal. Há 40 anos trabalha em meios de comunicação social. Trabalhou em emissoras de rádio, jornais impressos e portais. Registro Mtb/PR - 4451
See all stories →
Advertisement
Advertisement
Related news
Web Stories
All →
VideosMore videos you might like
BnT TV →
Part of the network
BnT OnlineNews portalCampos GeraisTravel appRádio BnTRadio · live
Viva Campos GeraisLong live Campos Gerais