Pavement of road between Imbaú and Reserva reaches 25%
PR-160 is receiving asphalt paving in a 28.36 km stretch. The project includes third lanes, a new bridge and two road bypasses. Along the stretch, drainage system devices and road signage are also being implemented.

The Roads Department of the Paraná (DER/PR) reached 25% of execution of the paving of the PR-160 between Imbaú and Reserva, in the Campos Gerais, an accumulated investment of R$ 46,881,606.02 so far.
The stretch is 28.36 kilometers long, which are receiving hot-machine asphalt concrete (CAUQ) pavement and includes the construction of a new bridge over the River São Pedro, whose structure is completed, third lanes and two road contours.
One of these outlines is in the district of José Lacerda, currently going through earthwork services to compose the platform of the track and construction of a concrete cellular gallery.
The other contour is on Imbaú, already receiving paving services, and will be a variant stretch of the highway, being connected to the lower passage of a BR-376 viaduct (Café Highway).
Along the stretch are also in implementation the devices of the water drainage system and road signage. The project also contemplates the planting of grass in the spaces next to the track, shelters for bus stops, fences delimiting the domain range, among other improvements.
Argentine driver is the second victim of the collision on PR-151 in Jaguariaíva
















