Road subsides and worries residents between Ouro Verde and Santa Marta, in PG
Road subsides in Ponta Grossa, between Ouro Verde and Santa Marta. Municipality confirms erosion caused by stormwater galleries and carries out repairs.

Residents of Ponta Grossa are concerned about the conditions of a road that connects the regions of Ouro Verde and Santa Marta. The stretch, located in Furiel Street, near number 484, shows signs of erosion and compromise of the terrain, a situation that generates concern with the safety of pedestrians and drivers.
According to the complaint sent to the Portal BnT Online, the road is used daily by several people, including workers and students who pass through the place to reach schools and workplaces.
The main concern of residents is that the advance of erosion could further compromise the road and cause accidents.
Residents report risk to road users
According to the report received by the report, the road presents points where the terrain is giving way, putting at risk those who need to use the passage.
The stretch is considered important for the mobility of residents, as it allows the displacement between Ouro Verde and Santa Marta.
The situation is particularly worrying about the movement of students, who use the route daily to reach educational institutions.
Faced with the problem, residents ask for measures to ensure safe conditions of circulation and prevent erosion from progressing.
The City Council confirms erosion and informs that works have already begun
Wanted by the Portal BnT Online, the Prefeitura de Ponta Grossa confirmed that the site was inspected by the Municipal Secretariat of Public Services last week.
According to the municipal administration, the problem was caused by the displacement of rain galleries, structures responsible for the flow of rainwater. The situation ended up causing erosion on the ground.
In an official note, the City Hall reported: "The City Hall informs that the site was inspected by the Municipal Secretariat of Public Services, already in the last week, and repairs on the site began last Friday (06). At this point, there was a displacement of the rain galleries, causing an erosion. At the moment, the teams are acting on site to recompose the galleries and regularize the terrain."
According to the Municipality, the works began on Friday (6) and continue on Monday (9).
Repairs seek to restore road safety
The municipal teams work on the recomposition of the rain galleries and the regularization of the affected terrain.
The recovery of the drainage structures is necessary to correct the problem that caused the erosion and reduce the risk of further damage to the stretch.
Despite the confirmation of the services, the City did not inform a specific deadline for the completion of repairs, nor did it detail whether there will be temporary restrictions on movement during the execution of the works.
As the interventions continue, the guidance is that pedestrians and drivers redouble their attention as they pass through the region and respect any signals from the responsible teams.
The Portal BnT Online keeps track of the situation.
























